CD9 Other Relevant Documents
- CD9-01 Summary Position Paper on Cambridge Autonomous Metro and the A428 Corridor produced by Arup 2018
- CD9-02 Manual for Streets
- CD9-03 Manual for Streets 2 2010
- CD9-04 Britpave - Guided Busway Design Handbook 2017
- CD9-05 Environmental Assessment of Traffic and Movement July 2023
- CD9-06 Design Manual for Roads and Bridges (DMRB) - Introduction to the Design Manual for Roads and Bridges September 2021
- CD9-07 Design Manual for Roads and Bridges (DMRB) - Highway Link Design March 2020
- CD9-08 Design Manual for Roads and Bridges (DMRB) - Geometric Design of At-Grade Priority November 2021
- CD9-09 Design Manual for Roads and Bridges (DMRB) - Cross-sections and Headrooms July 2021
- CD9-10 Design Manual for Roads and Bridges (DMRB) - Designing for Walking, Cycling and Horse-riding March 2021
- CD9-11 Design Manual for Roads and Bridges (DMRB) - Designing for Cycle Traffic March 2021
- CD9-12 Design Manual for Roads and Bridges (DMRB) - Requirements for Safety Risk Assessment January 2025
- CD9-13 Design Manual for Roads and Bridges (DMRB) - Road Safety Audit January 2020
- CD9-14 Design Manual for Roads and Bridges (DMRB) – LA 111 Noise and Vibration 2020
- CD9-15 Traffic Signs Manual Chapter 1 - Introduction 2018
- CD9-16 Traffic Signs Manual Chapter 2 - Primary Route Destinations in England
- CD9-17 Traffic Signs Manual Chapter 3 - Regulatory Signs 2019
- CD9-18 Traffic Signs Manual Chapter 4 - Warning Signs 2018
- CD9-19 Traffic Signs Manual Chapter 5 - Road Markings 2018
- CD9-20 Traffic Signs Manual Chapter 6 - Traffic Control 2019
- CD9-21 Traffic Signs Manual Chapter 7 - The Design of Traffic Signs 2018
- CD9-22 Traffic Signs Manual Chapter 8 Part 1 - Design 2009
- CD9-23 Traffic Signs Manual Chapter 8 Part 2 - Operations 2009
- CD9-24 Traffic Signs Manual Chapter 8 Part 3 - Update 2020
- CD9-25 WSP Technical Note for Cambourne to Cambridge TUBAs 2024
- CD9-26 Option Assessment Report for Cambourne to Cambridge Better Bus Journeys