CD-17 Reconvened Inquiry - Additional Documents
Phasing Drawings February 2026 - Option 1
- CD17.03-00 Index to Phasing Drawings February 2026 - Option 1
- CD17.03-01 HQ 37 Initial Site Establishment
- CD17.03-02 HQ 38 Phase A
- CD17.03-03 HQ 38-1 Phase A + perimeter seal into Phase B
- CD17.03-04 HQ 39 Phase B
- CD17.03-05 HQ 39-1 Phase B + perimeter seal into Phase C
- CD17.03-06 HQ 310 Phase C
- CD17.03-07 HQ 310-1 Phase C + perimeter seal into Phase D
- CD17.03-08 HQ 311 Phase D
- CD17.03-09 HQ 3/11-1 Phase D + perimeter seal into Phase E
- CD17.03-10 HQ 3/12 Phase E
- CD17.03-11 HQ 3/12-1 Phase E + perimeter seal into Phase F
- CD17.03-12 HQ 3/13 Phase F
- CD17.03-13 HQ 3/13-1 Phase F + perimeter seal into Phase G
- CD17.03-14 HQ 3/14 Phase G
- CD17.03-15 HQ 3/15 Final Restoration
- CD17.03-16 HQ 3/16 Popefield Farm
Phasing Drawings February 2026 - Option 2
- CD17.04-00 Index to Phasing Drawings February 2026 Option 2.pdf
- CD17.04-01 HQ 3/7 Initial Site Establishment
- CD17.04-02 HQ 3/8 Phase A
- CD17.04-03 HQ 3/8-1 Phase A + perimeter seal into Phase B
- CD17.04-04 HQ 3/9 Phase B
- CD17.04-05 HQ 3/9-1 Phase B + perimeter seal into Phase C
- CD17.04-06 HQ 3/10 Phase C
- CD17.04-07 HQ 3/10-2 Phase C + perimeter seal into Phase E
- CD17.04-08 HQ 3/12B Phase E
- CD17.04-09 HQ 3/12B-2 Phase E + perimeter seal into Phase D
- CD17.04-10 HQ 3/11B Phase D
- CD17.04-11 HQ 3/11B-2 Phase D + perimeter seal into Phase F
- CD17.04-12 HQ 3/13 Phase F
- CD17.04-13 HQ 3/13-1 Phase F + perimeter seal into Phase G
- CD17.04-14 HQ 3/14 Phase G
- CD17.04-15 HQ 3/15 Final Restoration
- CD17.04-16 HQ 3/16 Popefield Farm