CD1 Application Documents and Plans
(list as under consideration at date of Committee resolution in at date of SoS Call-in)
Please contact the Programme Officer if you have difficulties opening any documents.
- CD1.01 Application Form
- CD1.02 Drawing no. NFH-UNS-MAST-DR-1001 (Existing Block Plan)
- CD1.03 Drawing no. NFH-UNS-MAST-DR-1002 (Demolition Plan)
- CD1.04 Drawing no. NFH-UNS-MAST-DR-1003 (Location Plan)
- CD1.05 Drawing no. NFH-CGL- MAST-DR-1003 R02 (Flood Risk Vulnerability)
- CD1.06 Drawing no. NFH-CGL-MAST-DR-1004 R01 (Plots Plan)
- CD1.07 Drawing no. NFH-CGL-MAST-DR-1005 R01 (Land Use Zones LV00)
- CD1.08 Drawing no. NFH-CGL-MAST-DR-1006 R01 (Land Use Zones LV01)
- CD1.09 Drawing no. NFH-CGL-MAST-DR-1007 R01 (Land Use Zones LV02)
- CD1.10 Drawing no. NFH-CGL-MAST-DR-1008 R01 (Land Use Zones LV03 and above)
- CD1.11 Drawing no. NFH-CGL-MAST-DR-1009 R01 (Land Use Zones top floor level (variable))
- CD1.12 Drawing no. NFH-CGL-MAST-DR-1010 R02 (Built edge deviation plan Ground Floor – Podium levels)
- CD1.13 Drawing no. NFH-CGL-MAST-DR-1011 R02 (Built edge deviation plan Upper Floors – Tower Levels)
- CD1.14 Drawing no. NFH-CGL-MAST-DR-1012 R02 (Public Realm)
- CD1.15 Drawing no. NFH-CGL- MAST-DR-1013 R02 (Maximum Building Heights)
- CD1.16 Drawing no. NFH-CGL-MAST-DR-1014 R02 (Highway Access)
- CD1.17 Drawing no. NFH-CGL-MAST-DR-1016 R01 (Indicative Phasing)
- CD1.18 Drawing no. NFH-CGL-MAST-DR-1018 R02 (Neighbourhood Plan)
- CD1.19 Drawing no. NFH-CGL-MAST-DR-1019 R02 (Maximum Building Levels)
- CD1.20 Drawing no. NFH-CGL-MAST-DR-1020 R01 (Highways Proposals Overview)
- CD1.21 Drawing no. 226728/PD100 Rev. F (Site Access Plans – Keyplan)
- CD1.22 Drawing no. 226728/PD101 Rev. B (Site Access Plans – Junction 1)
- CD1.23 Drawing no. 226728/PD102 Rev. A (Site Access Plans – Junction 1)
- CD1.24 Drawing no. 226728/PD103 Rev. C (Site Access Plans – Junction 2)
- CD1.25 Drawing no. 226728/PD104 Rev. B (Site Access Plans – Junctions 3 & 4)
- CD1.26 Drawing no. 226728/PD105 Rev. B (Site Access Plans – Junctions 5 & 6)
- CD1.27 Drawing no. 226728/PD106 Rev. F (Site Access Plans – Junctions 7, 8 & 9)
- CD1.28 Drawing no. 226728/PD107 Rev. C (Site Access Plans – Junctions 10 & 11)
- CD1.29 Drawing no. 226728/PD108 Rev. A (Junction 7 – Pedestrian Crossings)
- CD1.30 Drawing no. 226728/PIC/01 Rev. E (Site Access Plans- Junction 7 Picady Measurements)
- CD1.31 Site Sections Plan - NFH-UNS-MAST-DR-2001
- CD1.32 to CD1.48 Drawing no. PE22040-ZZ-ZZ-CWO-DR-0100 to 0116 Existing Buildings 01-54
- CD1.49 Planning Statement
- CD1.50 Design and Access Statement (Rev A – April 2024 Update)
- CD1.51 Design Code (Rev. E – April 2024 Update)
- CD1.52 Environmental Statement Volume 1 – Chapter 1 Introduction
- CD1.53 Environmental Statement Volume 1 – Chapter 2 EIA Methodology
- CD1.54 Environmental Statement Volume 1 – Chapter 3 Alternatives and Design Evolution
- CD1.55 Environmental Statement Volume 1 – Chapter 4 The Proposed Development
- CD1.56 Environmental Statement Volume 1 – Chapter 5 Demolition and Construction
- CD1.57 Environmental Statement Volume 1 – Chapter 6 Socio-Economics and Health
- CD1.58 Environmental Statement Volume 1 – Chapter 7 Traffic and Transport
- CD1.59 Environmental Statement Volume 1 – Chapter 8 Air Quality
- CD1.60 Environmental Statement Volume 1 – Chapter 9 Noise and Vibration
- CD1.61 Environmental Statement Volume 1 – Chapter 10 Daylight, Sunlight, Overshadowing, Solar Glare and Light Intrusion
- CD1.62 Environmental Statement Volume 1 – Chapter 11 Wind Microclimate
- CD1.63 Environmental Statement Volume 1 – Chapter 12 Climate Change and Greenhouse Gas Assessment
- CD1.64 Environmental Statement Volume 1 – Chapter 13 Archaeology
- CD1.65 Environmental Statement Volume 1 – Chapter 14 Ecology and Biodiversity
- CD1.66 Environmental Statement Volume 1 – Chapter 15 Water Resources, Flood Risk, Drainage and Ground Conditions
- CD1.67 Environmental Statement Volume 1 – Chapter 16 Effects Interactions
- CD1.68 Environmental Statement Volume 1 – Chapter 17 Likely Significant Effects and Conclusions
- CD1.69 Environmental Statement Volume 1 – Chapter 18 Environmental Mitigation and Monitoring Schedule
- CD1.70-1 Environmental Statement Volume 2 – Townscape and Visual Impact Assessment Part 1
- CD1.70-2 Environmental Statement Volume 2 – Townscape and Visual Impact Assessment Part 2
- CD1.71 Environmental Statement Volume 3 – Technical Appendices – Part 1 – Introduction
- CD1.72 Environmental Statement Volume 3 – Technical Appendices – Part 2 – EIA Methodology
- CD1.73 Environmental Statement Volume 3 – Technical Appendices – Part 3 – Demolition and Construction
- CD1.74 Environmental Statement Volume 3 – Technical Appendices – Part 4 – Socio-Economics and Health
- CD1.75 Environmental Statement Volume 3 – Technical Appendices – Part 5 - Traffic and Transport
- CD1.76 Environmental Statement Volume 3 – Technical Appendices – Part 6 – Air Quality
- CD1.77 Environmental Statement Volume 3 – Technical Appendices – Part 7 – Noise and Vibration
- CD1.78 Environmental Statement Volume 3 – Technical Appendices – Part 8 - Daylight, Sunlight, Overshadowing, Solar Glare and Light Intrusion
- CD1.79 Environmental Statement Volume 3 – Technical Appendices – Part 9 – Wind Microclimate
- CD1.80 Environmental Statement Volume 3 – Technical Appendices – Part 10 – Climate Change and Greenhouse Gas Assessment
- CD1.81 Environmental Statement Volume 3 – Technical Appendices – Part 11 – Archaeology
- CD1.82 Environmental Statement Volume 3 – Technical Appendices – Part 12 – Ecology and Biodiversity
- CD1.83 Environmental Statement Volume 3 – Technical Appendices – Part 13 – Water Resources, Flood Risk, Drainage and Ground Conditions
- CD1.84 Environmental Statement Volume 3 – Technical Appendices – Part 14 – Outline Operational Waste Management and Recycling Management Strategy
- CD1.85 Environmental Statement Non Technical Summary
- CD1.86 Environmental Statement Response to AY (August 2023)
- CD1.87 Environmental Statement Response to Bureau Veritas (September 2023)
- CD1.88 Environmental Statement Assessment Update Letter (April 2024)
- CD1.89 Retail and Leisure Statement
- CD1.90 Framework Sustainability and Energy Statement (Rev. 01 dated 29th September 2022)
- CD1.91 Statement of Community Involvement (dated September 2022)
- CD1.92 Arboricultural Impact Assessment (dated 19th August 2022)
- CD1.93 Financial Viability Assessment (dated 30th September 2022)
- CD1.94 Financial Viability Assessment - Executive Summary
- CD1.95 Minerals Infrastructure Assessment (September 2022)
- CD1.96 Minerals Infrastructure Assessment – Response (August 2023)
- CD1.97 Flood Risk Assessment and Surface Water Drainage Strategy (Issue 9, 11th April 2024)
- CD1.98 Needs Case to Support Ebbsfleet United (August 2023)
- CD1.99 Northfleet Office Market Review (September 2023)
- CD1.100 Shadow HRA (October 2024)
- CD1.101 Floorspace Addendum Note (18th April 2024)
- CD1.102 Transport Assessment Addendum
- CD1.103 Kent County Council Highway Consultee Comments Review (23rd February 2024)
- CD1.104 Kent County Highway Consultee Comments Review (PROW) (9th February 2024)
- CD1.105 Applicant responses Covering Letter (29th August 2023)
- CD1.106 Statutory Response Covering Letter (26th February 2024)
- CD1.107 Briefing Note – Hotel (August 2023)
- CD1.108 Addendum Retail and Leisure Statement (August 2023)
- CD1.109 Construction Methodology Statement
- CD1.110 Biodiversity and Ecology Response with Wintering Bird Survey Report
- CD1.111 RMA Environment Agency Response Letter (August 2023)
- CD1.112 Northfleet Flood Modelling Technical Note 05.09.23
- CD1.113 Northfleet Harbourside - NE and KCC Response