Documents Submitted During the Inquiry
- INQ-01 Network Rail (NR) Opening Statement
- INQ-02 Bellaview Properties Limited (Bellaview) Opening Statement
- INQ-03 Note on the High Speed Rail (London - West Midlands) Act 2017 and works at Old Oak Common Lane
- INQ-04 Email trail between NR and DfT (James Slater)
- INQ-05 Burges Salmon letter to DfT November 2023
- INQ-06 Acton Main Line Aerial Photographs
- INQ-07 Email correspondence between Mark Connell and Ealing Council
- INQ-08 Correspondence between NR and Ealing Council
- INQ-09 BPL Letter to NR re Swept Path drawings and enclosures 10.11.23
- INQ-10 BPL Letter to NR re C Gent Rebuttal Evidence Technical Note and enclosures 13.11.24
- INQ-11.0 North Pole Depot area plan (proposed walking route for site visit) introduced 22 November 2023
- INQ-11.1 North Pole Depot area plan (proposed walking route for site visit)
- INQ-12 BPL Proposed Elevation – North Elevation (1217_GE-103 Rev P6)
- INQ-13 NR Response letter to Inspector regarding proposed modifications and need for additional consultation 29.11.23
- INQ-14 Land Plans 9-12 provided by Network Rail to Inspector in email dated 29 November 2023
- INQ-15 AG Network Rail's Comments on Draft Conditions dated 4 December 2023
- INQ-16 BLP letter to Inspector 11.12.23 re Inspector's note 24.11.23
- INQ-17 Draft Conditions (AG 4.12.2023) - NRF comments 11.12.23
- INQ-18 Extract - BPL s 106 Agreement (Highway Works)
- INQ-19.1 NR02 – The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (7 December 2023
- INQ-19.2 The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (10 November)
- INQ-20.1 NRF cover email re FOIA/EIR requests 12.12.23
- INQ-20.2 NRF’s FOIA/EIR request sent to Network Rail on 3 November 2023 (the November 2023 Request)
- INQ-20.3 Network Rail’s response dated 4 December 2023 to the November 2023 Request (Network Rail’s Response)
- INQ-20.4 NRF’s response to Network Rail’s Response dated 11 December 2023 (NRF’s Response).
- INQ-21 NR letter to Inspector 13.12.23 regarding Inspector's Note 24.11.23
- INQ-22 The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (7 December 2023) NRF Comments 14.12.23
- INQ-23.1 Network Rail (Old Oak Common Great Western Mainline Track Access) Order (7 December 2023) – NRF Comments14.12.23 (AG Comments 14.12.23)
- INQ-23.2 The Network Rail (Old Oak Common GWML) Order (14 December 2023)
- INQ-24 Supplementary Consultation Report (15 December 2023)
- INQ-25.1 NRF's and AG's comments on draft conditions);
- INQ-25.2 Revised Red Line Plan (0388965 – Acton Main Line Land Requirements_RevG) dated 13 December 2023
- INQ-26 Draft Option Agreement 15.12.23
- INQ-27 NRF letter regarding revised Draft Order 15.12.23
- INQ-28-1 NRF letter re comments on revised Draft Order 15.12.23
- INQ-28-2 NRF and AG comments on Draft Conditions 15.12.23
- INQ-29 NRF Additional comments on Draft Conditions 15.12.23
- INQ-30 NR Additional Consultation Pack 19.12.23
- INQ-31 NR letter to Inspector regarding provision of weight limits 05.01
- INQ-32 Inquiry Note - Weight restrictions on Friary Road (5 January 2024)
- INQ-33 NRF's Note on NR's Risk Assessments 05.01.24
- INQ-34 - OOC Lane Access Overview 05.01.24
- INQ-35 Rail Systems Mains Access 05.01.24
- INQ-36 RS RRAP Access v3 05.01.24
- INQ-37 NR Response to BPL's Commentary of Risk Assessments dated 10 Jan 2024
- INQ-38 Letter re direction for disclosure and Enclosure 1 15.01.24
- INQ-39 Attachments 1-14 to NRF Letter to the Inspector/Programme Officer dated 15 January 2024.zip
- INQ-40 NR response to BPL's Application for Disclosure 18.01.24
- INQ-41 Letter regarding BPL's response to NR note on weight restrictions (19.01.24)
- INQ-42 TN001 Response to NR weight restrictions note 18.01.24
- INQ-43 239 Horn Lane - Additional objection on behalf of BPL 30.01.24
- INQ-44.1 NR cover em re BPL application for disclosure 31.01.24
- INQ-44.2 Unilateral Deed of Undertaking signed by NRIL (not dated) (CERTIFIED COPY)
- INQ-44.3 Horn Lane, Deed of Unilateral Undertaking Summary
- INQ-44.4 Land Plans
- INQ-45 NRF letter to Addleshaw Goddard re disclosure (01.02.24)
- INQ-46 Enclosure 1 to Letter of 01.02.24 - INQ-45
- INQ-47 NRF's FOIA/EIR Request to DfT on behalf of BPL dated 01.02.24
- INQ-48 Attachments to FOIA/EIR Request (INQ-47) 01.02.24
- INQ-49 FOIA/EIR Request online form 01.02.24
- INQ-50 Note on Undertakings given to Agility Trains by HS2 02.02.24
- INQ-51 Appendices to Note on Undertakings given to Agility Trains by HS2 02.02.24
- INQ-52 Cover letter to NRF regarding Arcadis Reports 5.02.24
- INQ-53 152270-ARC-REP-ECV-000024 A01 Jewson Yard RRAP
- INQ-54 152270-ARC-REP-ECV-000025 A01 North Pole RRAP
- INQ-55 152270-ARC-REP-ECV-000026 A01 Options Report
- INQ-56 152270-ARC-REP-EMF-000005-P05
- INQ-57 em chain regarding access to reports
- INQ-58 Letter to Addleshaw Goddard re Revised Plans 06.02.24
- INQ-59 23-163-T-046-A - Plan 9 Warehouse operation additional shared access area
- INQ-60 23-163-T-036-B - Network Rail Site Sharing - markup
- INQ-61 23-163-T-056-A - Minibus Parking 4A - Alternative
- INQ-62 Response to BPL's Note on Undertakings Given to Agility Trains by HS2
- INQ-63 Letter to NRF regarding the additional objection 07.02.24
- INQ-64 Email 07.02.24 BPL to NR on site sharing plans
- INQ-65.1 BPL cover em re comments on revised draft Order and Unilateral Undertaking 08.02.24
- INQ-65.2 Network Rail (Old Oak Common Great Western Mainline Track Access) Order - NRF comments 7.2.23
- INQ-65.3 NR executed undertaking NRF comments 8.2.24
- INQ-66.1 NR em including documents for the roundtable discussion 08.02.24
- INQ-66.2 Network Rail (Old Oak Common Great Western Mainline Track Access) Order (8 February 2024)
- INQ-66.3 Explanatory Memorandum (7 February 2024)
- INQ-66.4 Explanatory Memorandum (7 February 2024) Comparison to Previous Version (10 November 2023)
- INQ-66.5 Horn Lane Land Plan 08_02_24
- INQ-66.6 Horn Lane Book of Reference Update February 2024
- INQ-67.1 The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (10 November 2023) (submitted 14.11.23)
- INQ-67.2 The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (COMPARISON) (10 November 2023)
- INQ-67.3 Revised Order Land Plan (14 November 2023)
- INQ-68 Drawing 181602-SRS-AZ03-MLN1-DRG-ECV-136001 P04
- INQ-69 Drawing 181602-SRS-AZ03-MLN1-DRG-ECV-136004 P02
- INQ-70.01 NR Email of 23.02.24 including final Order and other documents
- INQ-70.02 (1) Document -NR02 - The Network Rail (Old Oak Common Great Western Mainline Track Access) Order (23 February 2024)
- INQ-70.03 (2) COMPARISON 23_02_24 Document -NR02 - The Network Rail (Old Oak Common Great Western Mainline Track Access) Order
- INQ-70.04 (3) Validation Report
- INQ-70.05 (4) Explanatory Memorandum (23 February 2024)
- INQ-70.06 (5) NR OOC GWML Track Access Order Explanatory Memorandum (23 February 2024) COMPARISON 23_02_24
- INQ-70.07 (6) NR OOC GWML Track Access Order, Response to BPL’s Comments on Order provided on 8 February 2024, 23_02_24
- INQ-70.08 (7) Unilateral Deed of Undertaking signed by NRIL (not dated) (CERTIFIED COPY)
- INQ-70.09 (8) COMPARISON, Unilateral Undertaking, NR OOC GWML Track Access Order 23_02_24
- INQ-70.10 (9) Network Rail, Horn Lane, NR response to Inspector’s and BPL’s comments on unilateral undertaking
- INQ-70.11(10) Horn Lane, Network Rail Note on Vehicle Movements
- INQ-70.12 (11) Horn Lane, Note on Precedent Agreements with landowners
- INQ-71 BPL’s Planning Permission 05.03.24
- INQ-72 Email chain between NR and Ms Kuszta dated 20.12.23
- INQ-73 Email chain between NR and Ms Kuszta dated 31.01.24
- INQ-74 Email chain between NR and Ms Thompson dated 31.01.24
- INQ-75 BPL Closing Statement
- INQ-76 NR Closing Statement
- INQ-77 Addendum to NR Closing Statement
- INQ-78 Costs Application on behalf of BPL
- INQ-79 BPL Comments (8.3.24) on 23.2.34 Order
- INQ-80 BPL Comments (08.03.24) on NR Executed Undertaking dated 23.2.24
- INQ-81 BPL coments (08.03.24) on NR Explanatory Memorandum (23 February 2024)
- INQ-82 Unilateral Deed of Undertaking signed by NRIL (dated) (CERTIFIED COPY)
- INQ-83 NR response to BPL partial costs application 18.03.24
- INQ-84 Bellaview Properties Limited Costs Reply to NR (28 March 2024)
- INQ-85 Inspector's Letter to NRF & AG dated 22.01.24 regarding Direct Dislosure of Evidence
- INQ-86 Further letterfrom Inspector dated 01.02.24 regarding Direct Disclosure of Evidence